Demonstration project

Construction project management system.

Site, office and commercial teams working from the same information: what happened today, which drawing is current, and where the budget stands.

For demonstration only

The business problem

What happened on site reaches the office days later, on paper, and the cost report later still.

Site diaries, snags, drawings and variations travel by paper, photo and chat thread. Teams build from superseded drawings, variations go unrecorded and cost overruns appear after they could have been managed.

Proposed architecture

How the pieces fit.

  1. 01

    On site

    • Mobile app, works offline
    • Photos and sign-offs
    • Snag capture
  2. 02

    Platform

    • Projects and programme
    • Document control
    • Variations and approvals
  3. 03

    Systems

    • Accounting and cost
    • Drawing store
    • Reporting
  4. 04

    People

    • Site manager
    • Quantity surveyor
    • Director dashboard

Try it

Follow a day on site.

For demonstration only

1 Choose a case
2 Change the conditions

3 Run it

Pick something that happens on site and follow it back to the office.

ReadyPress play and watch it work.

Not started

The site diary is captured on a phone

With no signal, if need be.

What the system saw

The rule it applied

What it decided

Outcome

Choose a case and run it.

That was the sample case. What is yours?

Technology involved

What it is built from.

Specific products are chosen for each client's systems, data location and budget.

  • Offline-capable mobile appCapture on site, sync later.
  • Web platformProjects, programme, documents and approvals.
  • Document controlRevisions, issue registers and acknowledgements.
  • Accounting integrationCost data flows in; approved variations flow out.
  • DashboardsProgress and cost by project and in total.

Intended business benefit

What it is designed to achieve.

  • Fewer costly mistakes

    Teams build from the current drawing.

  • Variations captured

    Extra work is recorded and priced when it happens.

  • Earlier warning

    Cost and programme drift is visible while it can be managed.

Start here

Want this foryour business?

Tell us how the process works today. We will tell you what a version built for you would involve.