Case studies

Six operations, re-engineered.

Real projects, described with the client's details removed. Each one started as a set of disconnected manual processes and ended as a single system the business runs on.

  1. 01Logistics & Distribution · 2022Turning a fragmented logistics operation into one connected workflowJohannesburg-based logistics companyRead the case study

    Time spent coordinating jobs each day

    Before: 3 hours a dayAfter: 45 minutes a day

    1. Before

      • Spreadsheets, WhatsApp and email
      • Job details entered several times
      • Dispatch updated by hand
    2. We built

      • Bespoke logistics platform
      • Job, driver and vehicle allocation
      • Live job tracking and digital proof of delivery
    3. After

      • One connected operation
      • Less chasing and duplication
      • Customers updated without staff replying
  2. 02Construction & Fabrication · 2024Connecting estimating, fabrication, projects and site operationsGauteng engineering and fabrication contractorRead the case study

    Where project progress is tracked

    Before: 5 separate spreadsheetsAfter: 1 platform

    1. Before

      • Quotes, drawings and paperwork in different places
      • Teams working from different information
      • Workshop progress checked by hand
    2. We built

      • Project and production platform
      • Fabrication work orders and stage tracking
      • Purchase-order and material tracking
    3. After

      • Projects controlled from quote to installation
      • One place for project information
      • Structured workshop and site updates
  3. 03Chemical Manufacturing · 2021Automating a document-heavy chemical operationJohannesburg chemical manufacturerRead the case study

    Time to find a document

    Before: 8 minutesAfter: 20 seconds

    1. Before

      • SDSs and certificates across folders and email
      • Slow to find the right document
      • Risk of outdated documents in use
    2. We built

      • Chemical operations and document platform
      • Product, batch and supplier records
      • Version control and SDS management
    3. After

      • One place for product and compliance information
      • Structured document control
      • Reviews and renewals visible to management
  4. 04Branding & Merchandising · 2026From quotation chaos to an automated merchandise workflowSouth African branding and merchandising companyRead the case study

    Time to prepare a quotation

    Before: 25 minutesAfter: 10 seconds

    1. Before

      • Email, spreadsheets and messaging apps
      • Many hand-offs on every order
      • Quotations followed up by hand
    2. We built

      • Merchandise management platform
      • CRM and product catalogue
      • Automated quotations
    3. After

      • A structured enquiry-to-delivery pipeline
      • Less sales administration
      • Quotations no longer forgotten
  5. 05Auditing & Compliance · 2025Building a digital audit management platformSouth African auditing and compliance consultancyRead the case study

    Time to compile an audit pack

    Before: 2 daysAfter: 3 hours

    1. Before

      • Audit admin across different systems
      • Evidence and findings scattered
      • Corrective actions hard to chase
    2. We built

      • Audit and compliance platform
      • Planning, scheduling and auditor allocation
      • Digital checklists and evidence collection
    3. After

      • Audits run from planning to close-out
      • Clients see their own outstanding actions
      • A view across the whole audit portfolio
  6. 06Wholesale & Distribution · 2026Automating wholesale orders from enquiry to fulfilmentKwaZulu-Natal wholesale distributorRead the case study

    Manual steps to process an order

    Before: 12 stepsAfter: 4 steps

    1. Before

      • Orders by WhatsApp, phone, email and in person
      • Orders re-keyed by hand
      • Stock and pricing checked manually
    2. We built

      • Wholesale ordering platform
      • Customer accounts and specific pricing
      • Catalogue and stock visibility
    3. After

      • One view of customers, products and orders
      • Fewer manual order steps
      • A consistent ordering experience

Start here

Your operationcould be next.

Tell us where the work slows down. We will show you what a connected version of it would look like.